Sampling procedures for inspection by attributes - Part 2: Sampling plans indexed by limiting quality (LQ) for isolated lot inspection
This Uganda Standard specifies an acceptance sampling system for inspection by attributes indexed by limiting quality (LQ). The sampling system is used for lots in isolation (isolated sequences of lots, an isolated lot, a unique lot or a short series of lots), where switching rules, such as those of ISO 2859?1, are not applicable. Inspection levels, as provided by ISO 2859?1 to control the relative amount of inspection, are not provided in this document. In many industrial situations, in which switching rules might be used, they are not applied for a number of reasons, not all of which might be valid: production is intermittent (not continuous); production is from several different sources in varying quantities, i.e. "job lots"; lots are isolated; lots are resubmitted after inspection . This standard was published on 2022-12-13
Price | UGX 60,000/= |
---|---|
Category | SERVICES AND BUSINESS MANAGEMENT STANDARDS |
Status | Voluntary |
Format | |
TC | UNBS/TC 412, Applied statistics |
ICS | 03.120.30 Application of statistical methods |
Language | English |
Edition | 1st Edition |
Sales Rating |